[ Contact ]
Where are you stuck?
hello@traitstudioai.com
Pick one — we’ll write here where the first conversation should start.
[ How we start ]
Two weeks. Fixed scope. Clear output.
You don’t need to prepare a brief. At the end of two weeks you have a report on the current state and a control line that works. If you don’t continue, everything we built stays with you, documented.
[ Week 01 ]Current state
The real state of the repo, the pipeline or the space. Measured, not assumed.
- Baseline metrics
- Architecture boundary map
- Risk list
[ Week 02 ]First gate
A working first gate. One piece of work goes through the line end to end.
- Spec format
- Test + lint + security gate
- Preview environment
[ Week 03 — optional ]Production feature
A real feature passes the line and goes live.
- First end-to-end delivery
[ Week 04 — optional ]Metrics + handoff
Measurement panel and handover to the team.
- Documentation
- Team walkthrough